Here’s where I’m at now. Plan on eliminating the rod locker, pushing the back deck as far back as I can and just trying to add as much free space as possible.
Removed over 250lbs of wet foam. Most the floor was rotted and the wiring is a mess. Next up is sealing the rivets then foam