TinBoats.net
The original aluminum boat site!
Forums
New posts
Search forums
Blog
What's new
New posts
New media
New media comments
Latest activity
Media
New media
New comments
Search media
Members
Current visitors
Log in
Register
What's new
Search
Search
Search titles only
By:
New posts
Search forums
Menu
Log in
Register
Install the app
Install
Forums
Boats
Jon and V Boat Conversions & Modifications
Benjineer's Lund S-16 Mod
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Reply to thread
Help Support TinBoats.net:
This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.
Message
<blockquote data-quote="benjineer" data-source="post: 478690" data-attributes="member: 3833"><p>Where I left it yesterday. Planning to glass the outside of the livewell and work on plumbing before I can put the deck on. I haven’t decided how to get water in and out. I know I want a separate fill and recirc. The drain is going to be the hardest part. I’d like to put a thru hull under the well and go straight up through the bottom of the well and have a plug in it. That’s going to be the only way to completely drain it outside of the boat. What y’all think? I only have 2” under the well. Draining to the bilge is an option I guess, probably the easiest one. I think I can get away with putting my fill pump up front beside the well. It will only work when the boat is at rest, but I think I like it better than running hose all the way to the bilge. Overflow I’m just planning to go straight across from the top of the well to the hull. Also, I was planning to put a hinged access door on top of the deck to get to the pumps and plumbing, but I’m thinking now I’ll just cut out the front of the rod box for access. Still a lot to do in the back end.</p></blockquote><p></p>
[QUOTE="benjineer, post: 478690, member: 3833"] Where I left it yesterday. Planning to glass the outside of the livewell and work on plumbing before I can put the deck on. I haven’t decided how to get water in and out. I know I want a separate fill and recirc. The drain is going to be the hardest part. I’d like to put a thru hull under the well and go straight up through the bottom of the well and have a plug in it. That’s going to be the only way to completely drain it outside of the boat. What y’all think? I only have 2” under the well. Draining to the bilge is an option I guess, probably the easiest one. I think I can get away with putting my fill pump up front beside the well. It will only work when the boat is at rest, but I think I like it better than running hose all the way to the bilge. Overflow I’m just planning to go straight across from the top of the well to the hull. Also, I was planning to put a hinged access door on top of the deck to get to the pumps and plumbing, but I’m thinking now I’ll just cut out the front of the rod box for access. Still a lot to do in the back end. [/QUOTE]
Verification
Post reply
Forums
Boats
Jon and V Boat Conversions & Modifications
Benjineer's Lund S-16 Mod
Top