This is my first post and I would like to thank all for taking the time to read and respond.
I purchased a 1990 16' Lund Rebel that was in tough shape. The trailer needed to be redone as far as wiring, lights, wheel bearings, tires, jack and coupler. Now that that is done, the floor needs to be replaced as it is rotted through in spots. We removed the old floor and carpet yeaterday and cleaned the bilge. I found a local supplier of marine grade plywood and I will use a full sheet of 4' x 8' to replace the old floor. The question I have is what needs to be done with the plywood prior to installation?
I purchased a 1990 16' Lund Rebel that was in tough shape. The trailer needed to be redone as far as wiring, lights, wheel bearings, tires, jack and coupler. Now that that is done, the floor needs to be replaced as it is rotted through in spots. We removed the old floor and carpet yeaterday and cleaned the bilge. I found a local supplier of marine grade plywood and I will use a full sheet of 4' x 8' to replace the old floor. The question I have is what needs to be done with the plywood prior to installation?