hopper33
Member
Wondering how soon is safe to apply Gluvit after applying small amounts of 5200.
I have replaced some leaky rivets on the keel of my jon boat. When I did I applied some 5200 to the rivets and holes they were being installed in. Only a small amount of 5200, nothing "Caulked" on. I know the 5200 is not fully cured for 7 days. Would it safe to apply gluvit, on the rivets, both interior and exterior, prior to the full 7 days, or will that prevent the 5200 from fully curing?
Thank you for any insight.
I have replaced some leaky rivets on the keel of my jon boat. When I did I applied some 5200 to the rivets and holes they were being installed in. Only a small amount of 5200, nothing "Caulked" on. I know the 5200 is not fully cured for 7 days. Would it safe to apply gluvit, on the rivets, both interior and exterior, prior to the full 7 days, or will that prevent the 5200 from fully curing?
Thank you for any insight.