1648 Semi-V Jon Mod (Completed)

*****This section is for Full Boat Projects Only*****
Post Reply
User avatar
KevinWI
Posts: 360
Joined: 01 Jan 2012, 10:39
Location: Central Wisconsin

1648 Semi-V Jon Mod (Completed)

Post by KevinWI » 11 Jan 2012, 20:10

Before Pics and Vids as I bought the boat

Bought this boat, trailer and 1996 25hp 2 stroke Mercury tiller for $2400 last fall. I've been looking for 3 years for a boat like this for this price. It came with removable carpeted floors, two batteries and a 40lb thrust Minn kota trolling motor.

In the fall I built a removable duck blind for it. Now I'm setting it up as a fishing rig and duck hunting boat.
First Boat ride checking it out:
[youtube]w5fPUmKkO08[/youtube]



After this point will be updates regarding the modifications I made
Now my build will start with a new built in fabbed aluminum livewell. I had the idea in my head which I transferred to a cardboard mockup. The whole idea being that I wanted it to look and operate like it came with the boat from the manufacturer.
This is the most expensive part of the build. Frankly I'm not sure it's worth the cost for what I want, but with the cost of Aluminum, pumps, tubing and then fabrication time as well as install, I felt it was worth what they are charging me. Wish I could weld Aluminum, but I cannot. I thought about fiberglass, plastic plywood, etc. but nothing seemed to me to be what I wanted.
[youtube]Jn_ZGIiWFLM[/youtube]

The remainder of the build will be extending the front deck another 18" with access hatches (two ribs) by framing it out of aluminum angle, installing decking on the middle and rear bench seat, making a bench on the left side that spans the rear and middle seat to mount the fish locator and panel switches and just for other use. and finally installing a hinged deck over the back to hide the battery and gas tank...all of course carpeted.



My duck blind:
[youtube]FYkvPYd5lhc[/youtube]
Attachments
Kicker plate for trolling motor
Kicker plate for trolling motor
2011-12-21 13.37.15.jpg
Pulled the trigger and took it home
Pulled the trigger and took it home
Photo of it the day I bought it
Photo of it the day I bought it
Last edited by KevinWI on 14 Jun 2012, 08:33, edited 23 times in total.

User avatar
jasper60103
Posts: 1226
Joined: 02 Jul 2009, 07:39
Location: Twin Cities, MN.

1996 1648 Semi-V Jon Boat Modification Project

Post by jasper60103 » 11 Jan 2012, 22:40

Nice rig and runs great. Enjoy !
2018 Tracker Grizzly 1648
2018 30 HP Suzuki DF30A

User avatar
KevinWI
Posts: 360
Joined: 01 Jan 2012, 10:39
Location: Central Wisconsin

1996 1648 Semi-V Jon Boat Modification Project

Post by KevinWI » 13 Jan 2012, 00:25

Right now the boat is at the marina getting the tank fabricated. Should take a couple of weeks at least. Then I'll start the build.

So far I've procured the following:

3- 4x8 CDX Exterior grade plywood - $53
6- 1 1/4"x1x1 1/4" X 1/8"x 8'0" angle Aluminum $86.22 (best price I've found on Aluminum including shipping. Way cheaper than Lowes or Menards.
2 - 50ct. pop rivets $4
3- Quarts Henry 263 Carpet Adhesive - $28.27 (includes shipping)Tip from Jay415's Post
2 - Qt. Polyethylene Resin w/catalyst - $30.00
6 switch custom w/plug inl $169.00 incl. shipping
2 - Release a seat bracket $31.34 shipped( Tip from Gillhunter's Post
2-angle grinder metal cutting wheels $4
5- 12" Aluminum Piano Hinges - $16
2 - 6' Stainless Steel Piano Hinges - $22.50
21 feet of 16oz marine grade carpet - Sandstone - $155.00 shipped
2 -Timer Module: $70.00 shipped
Terminal Block: $15.00
Busbar: $17.34
inline fuse holder for timer: $9.00
50a breaker main $9.00
__________________________________________
Total for the build = $752.42 (not including the livewell)


Will post as the build continues.....
Last edited by KevinWI on 05 Feb 2012, 11:10, edited 4 times in total.

User avatar
KevinWI
Posts: 360
Joined: 01 Jan 2012, 10:39
Location: Central Wisconsin

1996 1648 Semi-V Jon Boat Modification Project

Post by KevinWI » 25 Jan 2012, 14:11

Update on the livewell:
Here are some pics of the livewell build. Turning out exactly as I planned.
Attachments
Cutting hole in seat for livewell
Cutting hole in seat for livewell
Cutting hole in the seat for livewell
Cutting hole in the seat for livewell
Livewell Tank Fabrication
Livewell Tank Fabrication
Livewell  Tank Fabrication. Installing hinges
Livewell Tank Fabrication. Installing hinges

User avatar
Jay415
Posts: 433
Joined: 09 Sep 2011, 07:02
Location: Long Island, NY

1996 1648 Semi-V Jon Boat Modification Project(updated pics)

Post by Jay415 » 25 Jan 2012, 14:55

You got a nice rig there! That motor runs nice! And I know your planning well! Can't wait to see it throughout the build!

User avatar
KevinWI
Posts: 360
Joined: 01 Jan 2012, 10:39
Location: Central Wisconsin

Alumacraft 1648 Semi-V Jon Project (updated pics 1/25/12)

Post by KevinWI » 26 Jan 2012, 20:14

Livewell Fabrication is done, plumbing all installed. (electrical incomplete though). Pics coming tomorrow...
Ordered the new switch panel and timer. Found some carpet at Lowes. Not sure if it will work or not....hooks pull out fairly easily and has rubber backing....soaking sample in water overnight to see how it does.

User avatar
gillhunter
Moderator
Posts: 1053
Joined: 10 Mar 2011, 11:47
Location: Winder, GA

Alumacraft 1648 Semi-V Jon Project (updated pics 1/25/12)

Post by gillhunter » 26 Jan 2012, 21:07

Looking forward to watching your project, looks like it will be a really good one =D> .

User avatar
KevinWI
Posts: 360
Joined: 01 Jan 2012, 10:39
Location: Central Wisconsin

Alumacraft 1648 Semi-V Jon Project (updated pics 1/25/12)

Post by KevinWI » 27 Jan 2012, 13:28

Fabrication is complete for the livewell. Here is how it turned out. You can look at the mockup video above to see it pretty much turned out as planned:

[youtube]3iBrvx2QQvE[/youtube]

User avatar
Jay415
Posts: 433
Joined: 09 Sep 2011, 07:02
Location: Long Island, NY

Alumacraft 1648 Semi-V Jon Project(updated pics/Vid 1/27/12)

Post by Jay415 » 27 Jan 2012, 14:43

Live well came out great!

User avatar
KevinWI
Posts: 360
Joined: 01 Jan 2012, 10:39
Location: Central Wisconsin

Alumacraft 1648 Semi-V Jon Project(updated pics/Vid 1/27/12)

Post by KevinWI » 27 Jan 2012, 16:20

One of thing items I found out quickly was that now with the fill pump installed in the back, my gas tank no longer fits. I had intended to build a small deck over the pump to protect it, but just realized my tank is too tall if I want to install a deck hatch on the back end as I had intended. So, my other option is to look for a longer lower profile gas tank. That'll be $40 I won't get back. lol

User avatar
Jay415
Posts: 433
Joined: 09 Sep 2011, 07:02
Location: Long Island, NY

Alumacraft 1648 Semi-V Jon Project(updated pics/Vid 1/27/12)

Post by Jay415 » 27 Jan 2012, 16:58

I had a similar problem with my bilge pump. Had to make sure it was tight against the transom otherwise as tank wouldn't fit.

User avatar
KevinWI
Posts: 360
Joined: 01 Jan 2012, 10:39
Location: Central Wisconsin

Alumacraft 1648 Semi-V Jon Project(updated pics/Vid 1/27/12)

Post by KevinWI » 28 Jan 2012, 20:35

continuing on with the build....a little cold in the garage this time of year, but this is fun stuff. Cut plywood for a bench and the vertical piece for extending the deck. Also installed the angle supports for the side shelf.
Attachments
Vertical plywood for front deck extension. This was tricky. Used a template and still was off slightly. Hopefully it will make it up with carpet thickness.
Vertical plywood for front deck extension. This was tricky. Used a template and still was off slightly. Hopefully it will make it up with carpet thickness.
angle support for side shelf
angle support for side shelf
Rear seat decking
Rear seat decking

User avatar
KevinWI
Posts: 360
Joined: 01 Jan 2012, 10:39
Location: Central Wisconsin

Alumacraft 1648 Semi-V Jon Project(New Pics 1/28/12)

Post by KevinWI » 29 Jan 2012, 19:58

Continued on with the modification today. Got a lot accomplished including cutting out the front deck, building the support framing for the side bench/shelf.
Originally I had only intended to build a shelf on the side, but now that the framing support is complete, it has me contemplating making it a storage area also. Mulling it over.

One error today. cut the front deck out. and the new area will be hinged hatch for storage. I used 1 1/2" of the existing aluminum deck as a platform support for the hinged area (so I didn't have to eat up any more 1/8" angle alum.). On the original front deck there was a hole cut out for the front swivel seat. So I proceeded to cut the hole out only to realize the plate of the swivel seat extended past the planned hinged area. :oops: oh well. Took the cutout, added some dust to some wood glue and glued it back in.....waiting for it all to set up before I start epoxying all the wood.
Was 19 degrees outside today, but I didn't notice...was having just too much fun to think about the cold. :D
Attachments
Side bench/Shelf
Side bench/Shelf
Side bench/shelf support
Side bench/shelf support
Front deck extension
Front deck extension
Rear bench seat and side bench
Rear bench seat and side bench

User avatar
KevinWI
Posts: 360
Joined: 01 Jan 2012, 10:39
Location: Central Wisconsin

Alumacraft 1648 Semi-V Jon Project(New Pics 1/29/12)

Post by KevinWI » 30 Jan 2012, 21:50

This is becoming extremely addictive. I so look forward to seeing it finished I try to use every spare minute working on it. today was just some tedious stuff at the stern mounting some angle brackets for a small removable deck for the gas tank and batteries to sit on.

The electrical is becoming way more costly that I would have predicted.

So far it's:
Custom Switch panel with breakers $169.00
2 -Timer Module: $70.00
Terminal Block: $15.00
Busbar: $17.34
inline fuse holder for timer: $9.00
Trolling motor 50a breaker $9.00
____________________________
Total: $ 290...yikes... and I haven't bought any wire or connectors yet.
I'm fortunate I'm internet savvy as I haven't paid for shipping yet on anything, so at least I saved that and no sales tax.
Last edited by KevinWI on 05 Feb 2012, 11:08, edited 2 times in total.

User avatar
bobcat_fisherman
Posts: 45
Joined: 31 Jan 2012, 16:06
Location: Texas

Alumacraft 1648 Semi-V Jon Project(New Pics 1/29/12)

Post by bobcat_fisherman » 31 Jan 2012, 16:36

I have a 14.5ft boat I just started working on and want to put a deck in it. How did you attach that aluminum angle to the boat? With screws or pop rivets? Also, how much weight will those angle brackets hold?

If I want to put a front deck on my boat can I just tun a piece of angle on each side of the hull and maybe 2 across? Or would that buckle from weight? I want it to hold 250lbs minimum.

Post Reply